KARACHI (HRNW): Despite official claims of a crackdown on illegal portions and unauthorized structures, the persistent rise of such constructions in District Central, particularly in Nazimabad, has sparked serious concerns among residents and transparency advocates.
Details of Unauthorized Projects:
Local sources indicate that illegal construction is allegedly flourishing in several blocks of Nazimabad. Specific reports highlight the following sites:
-
Nazimabad No. 1: Plots 8/9 and 1/4 in Block 1H are reportedly undergoing the construction of illegal portions with little to no intervention from regulatory bodies.
-
Nazimabad No. 2: Similar activities have resurfaced in Block 2E (Plot No. 8/17) and Block 2F (Plot No. 4/2), where building regulations are allegedly being bypassed.
Allegations of Collusion:
The silence and perceived inaction of the relevant authorities have led to serious allegations of a nexus between builders and certain officials within the Sindh Building Control Authority (SBCA). Sources claim that bribery and illicit financial settlements are the primary reasons behind the continued expansion of these illegal structures, which strain the city’s already fragile infrastructure.
Public Demand for Action:
Residents of the area have expressed deep frustration, noting that these unauthorized multi-story portions lead to severe sewerage issues, electricity overloads, and water shortages. They have formally called upon high-ranking provincial authorities to:
-
Initiate a transparent inquiry into the alleged collusion.
-
Take immediate legal action to demolish unauthorized structures.
-
Hold negligent or complicit officers accountable to restore the rule of law in urban planning.
Stand with us for the protection of human rights! Support the world’s No. 1 human rights news portal, HRNW (Human Rights News Worldwide). Our mission is to amplify the voice of the oppressed and strive for justice globally.
To support our cause and contribute, please visit: https://www.hrnww.com/?page_id=1083
![]()


